What is Sprint Planning Meeting?

Scrum planning meeting template
Scrum planning meeting template
Scrum planning meeting template
Natalie Marina
Natalie Marina
Natalie Marina

Natalie Marina

Natalie Marina

26 ene 2024

Feeling the pre-sprint jitters? Does the thought of diving into a new sprint without a clear roadmap trigger a mild (or not so mild) panic attack? Breathe easy, agile warriors!

This article is your compass, here to guide you through the often-mysterious realm of sprint planning meetings. We'll shed light on their purpose, structure, and key elements, equipping you with the knowledge and confidence to navigate your next planning session with poise and purpose.

Whether you're a seasoned scrum veteran or a curious newcomer, prepare to unveil the secrets of a successful sprint plan and set your next iteration on the path to victory!

📅 Master Meetings with Noty: Effortless Scrum Meeting Agenda

Revolutionize your meeting game with Noty! Effortlessly plan meetings with smart agendas, capture key insights in summaries, and stay on track with follow-ups. Click to streamline your meeting workflow with Noty!

Get your scrum planning meeting agenda

What is a sprint planning meeting?

A Sprint Planning Meeting is a key event in the Scrum framework, which is an agile methodology for managing and executing software development projects. The purpose of the Sprint Planning Meeting is to set the direction for the upcoming sprint – a time-boxed iteration typically lasting two to four weeks.

During the Sprint Planning Meeting, the Scrum Team, which includes the Product Owner, Scrum Master, and the Development Team, collaborates to achieve the following objectives:

  • Review and refinement: The Product Owner presents the prioritized Product Backlog items to the Development Team. The team reviews and refines these items to ensure a shared understanding of the work to be done.

  • Capacity planning: The Development Team assesses its capacity for the upcoming sprint based on historical performance and any potential disruptions. This helps in determining how much work can be pulled into the sprint.

  • Selecting sprint backlog items: The Development Team, with input from the Product Owner, selects a set of Product Backlog items to include in the upcoming sprint. These items collectively form the Sprint Backlog.

  • Definition of Done: The team reviews and confirms the "Definition of Done," which is a set of criteria that must be met for each product backlog item to be considered complete. This ensures a shared understanding of the quality standards.

  • Task breakdown (optional): Depending on the team's preference, the selected Product Backlog items may be further broken down into smaller tasks. This helps in creating a more detailed plan for the work to be accomplished during the sprint.

The outcome of the Sprint Planning Meeting is a well-defined Sprint Goal, a committed set of Product Backlog items in the Sprint Backlog, and a shared understanding among the team members about the scope and expectations for the upcoming sprint.

What are the two primary goals of the sprint planning meeting?

The Sprint Planning Meeting in the Scrum framework has two primary goals.

Define the Sprint Goal

The team collaborates with the Product Owner to establish a clear and concise Sprint Goal. The Sprint Goal represents the overarching objective that the team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

Select and Define Sprint Backlog Items

The Development Team, with input from the Product Owner, selects a set of Product Backlog items that they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

The team collaboratively discusses and defines the tasks and subtasks associated with the chosen items, ensuring a shared understanding of the work to be done.

By achieving these two goals, the Sprint Planning Meeting sets the foundation for a successful sprint. The team leaves the meeting with a clear objective (Sprint Goal) and a committed set of work items (Sprint Backlog) that they believe they can deliver by the end of the sprint.

This clarity and commitment contribute to transparency, collaboration, and focus within the Scrum Team throughout the sprint.

Sprint Planning Meetings are typically time-boxed, with the duration determined by the length of the sprint. They are crucial for fostering collaboration, transparency, and commitment within the Scrum Team, ensuring a focused and productive sprint.

🚀 Boost Your Productivity with Noty's Smart To-Do Lists!

Elevate your task management game! Explore Noty's intuitive to-do lists to organize, prioritize, and conquer your daily goals. Click now to experience seamless productivity at your fingertips!

Get started with to-do lists

The time-box for the sprint planning meeting is?

The time-box for a Sprint Planning Meeting in the Scrum framework is typically set based on the length of the sprint. The general guideline is that the Sprint Planning Meeting should not exceed 8 hours for a one-month (four-week) sprint. However, for shorter sprints, the time-box is adjusted accordingly.

The specific recommendations are the following:

  • For a one-month sprint (four weeks), the time-box is up to 8 hours.

  • For a two-week sprint, the time-box is often suggested to be around 4 hours.

  • For a one-week sprint, the time-box may be further reduced, possibly to 2 hours or less.

It's important to note that the time-box is a maximum limit, and the Scrum Team should aim to complete the Sprint Planning Meeting as efficiently as possible within that time frame.

The Scrum Master plays a crucial role in facilitating the meeting and ensuring that the team stays focused on the objectives of the Sprint Planning process.

The sprint planning meeting is comprised of how many sections?

The Sprint Planning Meeting in the Scrum framework typically consists of two main sections:

Part 1: What Can Be Done (What) - What will be delivered in the Increment?

The first part of the Sprint Planning Meeting focuses on determining the goal for the sprint and selecting the Product Backlog items that will contribute to achieving that goal. It involves discussions between the Product Owner and the Development Team to clarify and understand the scope of work.

Part 2: How Will It Be Done (How) - How will the chosen work get done?

The second part of the Sprint Planning Meeting is more focused on the technical details and planning of how the selected Product Backlog items will be developed and delivered. The Development Team collaborates to create a plan, break down tasks (if necessary), and estimate the effort required.

These two parts help ensure that the team has a shared understanding of the goals for the sprint and how they plan to achieve those goals. The meeting is designed to encourage collaboration, transparency, and commitment within the Scrum Team.

How much of the sprint backlog must be defined during the sprint planning meeting?

During the Sprint Planning Meeting in the Scrum framework, the Scrum Team aims to define enough of the Sprint Backlog to forecast what can be achieved in the upcoming sprint. The entire Sprint Backlog doesn't need to be fully defined during the Sprint Planning Meeting.

Instead, the team focuses on selecting a reasonable amount of work that can be accomplished within the sprint and then defines the associated tasks and details for that selected work.

The key elements that must be defined during the Sprint Planning Meeting include Sprint Goal, Product Backlog Items, and Definition of Done.

While these elements must be defined, the detailed tasks and subtasks associated with the selected Product Backlog items may not be fully defined during the Sprint Planning Meeting.

The idea is to strike a balance between having a clear plan for the selected work and allowing for flexibility and adaptability within the sprint. The Scrum Team may refine and adjust the Sprint Backlog as they gain more insights during the sprint.

🌐 Never Miss a Beat: Noty's Meeting Follow-ups at Your Fingertips!

Ready to lead impactful meetings? Noty's AI meeting follow-ups keep you on track and ensure nothing gets overlooked. Click to elevate your meeting leadership skills and leave a lasting impression!

Learn about AI follow-ups

What is the maximum duration of each sprint planning meeting section?

In the Scrum framework, there isn't a strict maximum duration specified for each section of the Sprint Planning Meeting. However, the overall time-box for the entire Sprint Planning Meeting is recommended to be within certain limits based on the length of the sprint. The guidance is as follows:

For a one-month (four-week) sprint: The overall time-box for the entire Sprint Planning Meeting is suggested to be up to 8 hours.

For shorter sprints (e.g., two weeks or one week): The overall time-box for the entire Sprint Planning Meeting is adjusted accordingly, and it is generally recommended to be proportionally shorter.

While there is no specific maximum duration assigned to each section (What and How) of the Sprint Planning Meeting, the Scrum Team is encouraged to manage the time effectively to achieve the meeting's objectives.

The Scrum Master plays a crucial role in facilitating the meeting, keeping discussions focused, and ensuring that the team stays within the time-box constraints.

It's important to note that these are guidelines, and the Scrum Team may adapt the time-boxes based on their specific context and the need for in-depth discussions.

The primary goal is to have a productive and collaborative meeting that results in a clear Sprint Goal and a committed set of work for the Sprint Backlog.

Final Thoughts

Remember, sprint planning is an iterative process, and continuous improvement is key. Don't hesitate to experiment with different techniques, adapt the process to your specific team dynamics, and embrace the collaborative spirit that lies at the heart of effective scrum practices.

By wielding the power of a well-structured sprint planning meeting agenda, you'll unlock the potential for focused sprints, achievable goals, and ultimately, project success.

So, step into your role as sprint planning maestro, lead your team with clarity and purpose, and watch your agile journey unfold with efficiency and satisfaction. Remember, knowledge is power, and a well-planned sprint is a sprint half-won!

🚀 Close Meetings Strong with Noty's Summary Wizardry!

Seal the deal! Noty's meeting summary feature simplifies post-meeting actions. Click to discover how Noty ensures nothing falls through the cracks, leaving you with successful outcomes.

Elevate your meeting summary game today!

FAQ: Sprint Planning Meeting in Scrum

What is a Sprint Planning Meeting?

The Sprint Planning Meeting is a key event in the Scrum framework, where the Scrum Team collaborates to define the Sprint Goal and select Product Backlog items for the upcoming sprint. It involves discussions between the Product Owner, Scrum Master, and the Development Team to plan and commit to the work that will be completed during the sprint.

Who participates in the Sprint Planning Meeting?

The Sprint Planning Meeting involves the entire Scrum Team, including the Product Owner, Scrum Master, and the Development Team. Their collaboration is essential to ensure a shared understanding of the sprint goal and the work to be accomplished.

What is the purpose of the Sprint Goal?

The Sprint Goal represents the overarching objective that the Scrum Team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

How are Product Backlog items selected during the Sprint Planning Meeting?

The Product Owner presents prioritized Product Backlog items, and the Development Team, with input from the Product Owner, selects a set of items they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

Is the entire Sprint Backlog defined during the Sprint Planning Meeting?

While the entire Sprint Backlog is not fully defined during the meeting, the Scrum Team defines enough to forecast what can be achieved in the sprint. The focus is on the Sprint Goal, selected Product Backlog items, and a shared understanding of how the work will be done.

What is the role of the Scrum Master in the Sprint Planning Meeting?

The Scrum Master facilitates the Sprint Planning Meeting, ensures that it stays within the time-box, and fosters collaboration among team members. They help remove impediments and create an environment conducive to effective planning.

Can Sprint Planning Meetings vary in duration?

Yes, the duration of Sprint Planning Meetings can vary based on the length of the sprint. For a one-month sprint, it is generally suggested to be up to 8 hours, with adjustments for shorter sprints.

How often does a Sprint Planning Meeting occur?

Sprint Planning Meetings occur at the beginning of each sprint, providing the team with a focused planning session to set the direction for the upcoming work.

What happens if the team cannot complete the selected work during the sprint?

If the team cannot complete the selected work during the sprint, it is discussed in the Sprint Review, and the reasons are explored. This feedback informs future planning and adaptations in subsequent sprints.

Can the Sprint Backlog be adjusted during the sprint?

Yes, the Sprint Backlog can be adjusted during the sprint based on insights gained, changes in priorities, or emerging requirements. The Scrum Team collaborates to adapt to evolving circumstances.

Feeling the pre-sprint jitters? Does the thought of diving into a new sprint without a clear roadmap trigger a mild (or not so mild) panic attack? Breathe easy, agile warriors!

This article is your compass, here to guide you through the often-mysterious realm of sprint planning meetings. We'll shed light on their purpose, structure, and key elements, equipping you with the knowledge and confidence to navigate your next planning session with poise and purpose.

Whether you're a seasoned scrum veteran or a curious newcomer, prepare to unveil the secrets of a successful sprint plan and set your next iteration on the path to victory!

📅 Master Meetings with Noty: Effortless Scrum Meeting Agenda

Revolutionize your meeting game with Noty! Effortlessly plan meetings with smart agendas, capture key insights in summaries, and stay on track with follow-ups. Click to streamline your meeting workflow with Noty!

Get your scrum planning meeting agenda

What is a sprint planning meeting?

A Sprint Planning Meeting is a key event in the Scrum framework, which is an agile methodology for managing and executing software development projects. The purpose of the Sprint Planning Meeting is to set the direction for the upcoming sprint – a time-boxed iteration typically lasting two to four weeks.

During the Sprint Planning Meeting, the Scrum Team, which includes the Product Owner, Scrum Master, and the Development Team, collaborates to achieve the following objectives:

  • Review and refinement: The Product Owner presents the prioritized Product Backlog items to the Development Team. The team reviews and refines these items to ensure a shared understanding of the work to be done.

  • Capacity planning: The Development Team assesses its capacity for the upcoming sprint based on historical performance and any potential disruptions. This helps in determining how much work can be pulled into the sprint.

  • Selecting sprint backlog items: The Development Team, with input from the Product Owner, selects a set of Product Backlog items to include in the upcoming sprint. These items collectively form the Sprint Backlog.

  • Definition of Done: The team reviews and confirms the "Definition of Done," which is a set of criteria that must be met for each product backlog item to be considered complete. This ensures a shared understanding of the quality standards.

  • Task breakdown (optional): Depending on the team's preference, the selected Product Backlog items may be further broken down into smaller tasks. This helps in creating a more detailed plan for the work to be accomplished during the sprint.

The outcome of the Sprint Planning Meeting is a well-defined Sprint Goal, a committed set of Product Backlog items in the Sprint Backlog, and a shared understanding among the team members about the scope and expectations for the upcoming sprint.

What are the two primary goals of the sprint planning meeting?

The Sprint Planning Meeting in the Scrum framework has two primary goals.

Define the Sprint Goal

The team collaborates with the Product Owner to establish a clear and concise Sprint Goal. The Sprint Goal represents the overarching objective that the team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

Select and Define Sprint Backlog Items

The Development Team, with input from the Product Owner, selects a set of Product Backlog items that they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

The team collaboratively discusses and defines the tasks and subtasks associated with the chosen items, ensuring a shared understanding of the work to be done.

By achieving these two goals, the Sprint Planning Meeting sets the foundation for a successful sprint. The team leaves the meeting with a clear objective (Sprint Goal) and a committed set of work items (Sprint Backlog) that they believe they can deliver by the end of the sprint.

This clarity and commitment contribute to transparency, collaboration, and focus within the Scrum Team throughout the sprint.

Sprint Planning Meetings are typically time-boxed, with the duration determined by the length of the sprint. They are crucial for fostering collaboration, transparency, and commitment within the Scrum Team, ensuring a focused and productive sprint.

🚀 Boost Your Productivity with Noty's Smart To-Do Lists!

Elevate your task management game! Explore Noty's intuitive to-do lists to organize, prioritize, and conquer your daily goals. Click now to experience seamless productivity at your fingertips!

Get started with to-do lists

The time-box for the sprint planning meeting is?

The time-box for a Sprint Planning Meeting in the Scrum framework is typically set based on the length of the sprint. The general guideline is that the Sprint Planning Meeting should not exceed 8 hours for a one-month (four-week) sprint. However, for shorter sprints, the time-box is adjusted accordingly.

The specific recommendations are the following:

  • For a one-month sprint (four weeks), the time-box is up to 8 hours.

  • For a two-week sprint, the time-box is often suggested to be around 4 hours.

  • For a one-week sprint, the time-box may be further reduced, possibly to 2 hours or less.

It's important to note that the time-box is a maximum limit, and the Scrum Team should aim to complete the Sprint Planning Meeting as efficiently as possible within that time frame.

The Scrum Master plays a crucial role in facilitating the meeting and ensuring that the team stays focused on the objectives of the Sprint Planning process.

The sprint planning meeting is comprised of how many sections?

The Sprint Planning Meeting in the Scrum framework typically consists of two main sections:

Part 1: What Can Be Done (What) - What will be delivered in the Increment?

The first part of the Sprint Planning Meeting focuses on determining the goal for the sprint and selecting the Product Backlog items that will contribute to achieving that goal. It involves discussions between the Product Owner and the Development Team to clarify and understand the scope of work.

Part 2: How Will It Be Done (How) - How will the chosen work get done?

The second part of the Sprint Planning Meeting is more focused on the technical details and planning of how the selected Product Backlog items will be developed and delivered. The Development Team collaborates to create a plan, break down tasks (if necessary), and estimate the effort required.

These two parts help ensure that the team has a shared understanding of the goals for the sprint and how they plan to achieve those goals. The meeting is designed to encourage collaboration, transparency, and commitment within the Scrum Team.

How much of the sprint backlog must be defined during the sprint planning meeting?

During the Sprint Planning Meeting in the Scrum framework, the Scrum Team aims to define enough of the Sprint Backlog to forecast what can be achieved in the upcoming sprint. The entire Sprint Backlog doesn't need to be fully defined during the Sprint Planning Meeting.

Instead, the team focuses on selecting a reasonable amount of work that can be accomplished within the sprint and then defines the associated tasks and details for that selected work.

The key elements that must be defined during the Sprint Planning Meeting include Sprint Goal, Product Backlog Items, and Definition of Done.

While these elements must be defined, the detailed tasks and subtasks associated with the selected Product Backlog items may not be fully defined during the Sprint Planning Meeting.

The idea is to strike a balance between having a clear plan for the selected work and allowing for flexibility and adaptability within the sprint. The Scrum Team may refine and adjust the Sprint Backlog as they gain more insights during the sprint.

🌐 Never Miss a Beat: Noty's Meeting Follow-ups at Your Fingertips!

Ready to lead impactful meetings? Noty's AI meeting follow-ups keep you on track and ensure nothing gets overlooked. Click to elevate your meeting leadership skills and leave a lasting impression!

Learn about AI follow-ups

What is the maximum duration of each sprint planning meeting section?

In the Scrum framework, there isn't a strict maximum duration specified for each section of the Sprint Planning Meeting. However, the overall time-box for the entire Sprint Planning Meeting is recommended to be within certain limits based on the length of the sprint. The guidance is as follows:

For a one-month (four-week) sprint: The overall time-box for the entire Sprint Planning Meeting is suggested to be up to 8 hours.

For shorter sprints (e.g., two weeks or one week): The overall time-box for the entire Sprint Planning Meeting is adjusted accordingly, and it is generally recommended to be proportionally shorter.

While there is no specific maximum duration assigned to each section (What and How) of the Sprint Planning Meeting, the Scrum Team is encouraged to manage the time effectively to achieve the meeting's objectives.

The Scrum Master plays a crucial role in facilitating the meeting, keeping discussions focused, and ensuring that the team stays within the time-box constraints.

It's important to note that these are guidelines, and the Scrum Team may adapt the time-boxes based on their specific context and the need for in-depth discussions.

The primary goal is to have a productive and collaborative meeting that results in a clear Sprint Goal and a committed set of work for the Sprint Backlog.

Final Thoughts

Remember, sprint planning is an iterative process, and continuous improvement is key. Don't hesitate to experiment with different techniques, adapt the process to your specific team dynamics, and embrace the collaborative spirit that lies at the heart of effective scrum practices.

By wielding the power of a well-structured sprint planning meeting agenda, you'll unlock the potential for focused sprints, achievable goals, and ultimately, project success.

So, step into your role as sprint planning maestro, lead your team with clarity and purpose, and watch your agile journey unfold with efficiency and satisfaction. Remember, knowledge is power, and a well-planned sprint is a sprint half-won!

🚀 Close Meetings Strong with Noty's Summary Wizardry!

Seal the deal! Noty's meeting summary feature simplifies post-meeting actions. Click to discover how Noty ensures nothing falls through the cracks, leaving you with successful outcomes.

Elevate your meeting summary game today!

FAQ: Sprint Planning Meeting in Scrum

What is a Sprint Planning Meeting?

The Sprint Planning Meeting is a key event in the Scrum framework, where the Scrum Team collaborates to define the Sprint Goal and select Product Backlog items for the upcoming sprint. It involves discussions between the Product Owner, Scrum Master, and the Development Team to plan and commit to the work that will be completed during the sprint.

Who participates in the Sprint Planning Meeting?

The Sprint Planning Meeting involves the entire Scrum Team, including the Product Owner, Scrum Master, and the Development Team. Their collaboration is essential to ensure a shared understanding of the sprint goal and the work to be accomplished.

What is the purpose of the Sprint Goal?

The Sprint Goal represents the overarching objective that the Scrum Team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

How are Product Backlog items selected during the Sprint Planning Meeting?

The Product Owner presents prioritized Product Backlog items, and the Development Team, with input from the Product Owner, selects a set of items they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

Is the entire Sprint Backlog defined during the Sprint Planning Meeting?

While the entire Sprint Backlog is not fully defined during the meeting, the Scrum Team defines enough to forecast what can be achieved in the sprint. The focus is on the Sprint Goal, selected Product Backlog items, and a shared understanding of how the work will be done.

What is the role of the Scrum Master in the Sprint Planning Meeting?

The Scrum Master facilitates the Sprint Planning Meeting, ensures that it stays within the time-box, and fosters collaboration among team members. They help remove impediments and create an environment conducive to effective planning.

Can Sprint Planning Meetings vary in duration?

Yes, the duration of Sprint Planning Meetings can vary based on the length of the sprint. For a one-month sprint, it is generally suggested to be up to 8 hours, with adjustments for shorter sprints.

How often does a Sprint Planning Meeting occur?

Sprint Planning Meetings occur at the beginning of each sprint, providing the team with a focused planning session to set the direction for the upcoming work.

What happens if the team cannot complete the selected work during the sprint?

If the team cannot complete the selected work during the sprint, it is discussed in the Sprint Review, and the reasons are explored. This feedback informs future planning and adaptations in subsequent sprints.

Can the Sprint Backlog be adjusted during the sprint?

Yes, the Sprint Backlog can be adjusted during the sprint based on insights gained, changes in priorities, or emerging requirements. The Scrum Team collaborates to adapt to evolving circumstances.

Feeling the pre-sprint jitters? Does the thought of diving into a new sprint without a clear roadmap trigger a mild (or not so mild) panic attack? Breathe easy, agile warriors!

This article is your compass, here to guide you through the often-mysterious realm of sprint planning meetings. We'll shed light on their purpose, structure, and key elements, equipping you with the knowledge and confidence to navigate your next planning session with poise and purpose.

Whether you're a seasoned scrum veteran or a curious newcomer, prepare to unveil the secrets of a successful sprint plan and set your next iteration on the path to victory!

📅 Master Meetings with Noty: Effortless Scrum Meeting Agenda

Revolutionize your meeting game with Noty! Effortlessly plan meetings with smart agendas, capture key insights in summaries, and stay on track with follow-ups. Click to streamline your meeting workflow with Noty!

Get your scrum planning meeting agenda

What is a sprint planning meeting?

A Sprint Planning Meeting is a key event in the Scrum framework, which is an agile methodology for managing and executing software development projects. The purpose of the Sprint Planning Meeting is to set the direction for the upcoming sprint – a time-boxed iteration typically lasting two to four weeks.

During the Sprint Planning Meeting, the Scrum Team, which includes the Product Owner, Scrum Master, and the Development Team, collaborates to achieve the following objectives:

  • Review and refinement: The Product Owner presents the prioritized Product Backlog items to the Development Team. The team reviews and refines these items to ensure a shared understanding of the work to be done.

  • Capacity planning: The Development Team assesses its capacity for the upcoming sprint based on historical performance and any potential disruptions. This helps in determining how much work can be pulled into the sprint.

  • Selecting sprint backlog items: The Development Team, with input from the Product Owner, selects a set of Product Backlog items to include in the upcoming sprint. These items collectively form the Sprint Backlog.

  • Definition of Done: The team reviews and confirms the "Definition of Done," which is a set of criteria that must be met for each product backlog item to be considered complete. This ensures a shared understanding of the quality standards.

  • Task breakdown (optional): Depending on the team's preference, the selected Product Backlog items may be further broken down into smaller tasks. This helps in creating a more detailed plan for the work to be accomplished during the sprint.

The outcome of the Sprint Planning Meeting is a well-defined Sprint Goal, a committed set of Product Backlog items in the Sprint Backlog, and a shared understanding among the team members about the scope and expectations for the upcoming sprint.

What are the two primary goals of the sprint planning meeting?

The Sprint Planning Meeting in the Scrum framework has two primary goals.

Define the Sprint Goal

The team collaborates with the Product Owner to establish a clear and concise Sprint Goal. The Sprint Goal represents the overarching objective that the team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

Select and Define Sprint Backlog Items

The Development Team, with input from the Product Owner, selects a set of Product Backlog items that they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

The team collaboratively discusses and defines the tasks and subtasks associated with the chosen items, ensuring a shared understanding of the work to be done.

By achieving these two goals, the Sprint Planning Meeting sets the foundation for a successful sprint. The team leaves the meeting with a clear objective (Sprint Goal) and a committed set of work items (Sprint Backlog) that they believe they can deliver by the end of the sprint.

This clarity and commitment contribute to transparency, collaboration, and focus within the Scrum Team throughout the sprint.

Sprint Planning Meetings are typically time-boxed, with the duration determined by the length of the sprint. They are crucial for fostering collaboration, transparency, and commitment within the Scrum Team, ensuring a focused and productive sprint.

🚀 Boost Your Productivity with Noty's Smart To-Do Lists!

Elevate your task management game! Explore Noty's intuitive to-do lists to organize, prioritize, and conquer your daily goals. Click now to experience seamless productivity at your fingertips!

Get started with to-do lists

The time-box for the sprint planning meeting is?

The time-box for a Sprint Planning Meeting in the Scrum framework is typically set based on the length of the sprint. The general guideline is that the Sprint Planning Meeting should not exceed 8 hours for a one-month (four-week) sprint. However, for shorter sprints, the time-box is adjusted accordingly.

The specific recommendations are the following:

  • For a one-month sprint (four weeks), the time-box is up to 8 hours.

  • For a two-week sprint, the time-box is often suggested to be around 4 hours.

  • For a one-week sprint, the time-box may be further reduced, possibly to 2 hours or less.

It's important to note that the time-box is a maximum limit, and the Scrum Team should aim to complete the Sprint Planning Meeting as efficiently as possible within that time frame.

The Scrum Master plays a crucial role in facilitating the meeting and ensuring that the team stays focused on the objectives of the Sprint Planning process.

The sprint planning meeting is comprised of how many sections?

The Sprint Planning Meeting in the Scrum framework typically consists of two main sections:

Part 1: What Can Be Done (What) - What will be delivered in the Increment?

The first part of the Sprint Planning Meeting focuses on determining the goal for the sprint and selecting the Product Backlog items that will contribute to achieving that goal. It involves discussions between the Product Owner and the Development Team to clarify and understand the scope of work.

Part 2: How Will It Be Done (How) - How will the chosen work get done?

The second part of the Sprint Planning Meeting is more focused on the technical details and planning of how the selected Product Backlog items will be developed and delivered. The Development Team collaborates to create a plan, break down tasks (if necessary), and estimate the effort required.

These two parts help ensure that the team has a shared understanding of the goals for the sprint and how they plan to achieve those goals. The meeting is designed to encourage collaboration, transparency, and commitment within the Scrum Team.

How much of the sprint backlog must be defined during the sprint planning meeting?

During the Sprint Planning Meeting in the Scrum framework, the Scrum Team aims to define enough of the Sprint Backlog to forecast what can be achieved in the upcoming sprint. The entire Sprint Backlog doesn't need to be fully defined during the Sprint Planning Meeting.

Instead, the team focuses on selecting a reasonable amount of work that can be accomplished within the sprint and then defines the associated tasks and details for that selected work.

The key elements that must be defined during the Sprint Planning Meeting include Sprint Goal, Product Backlog Items, and Definition of Done.

While these elements must be defined, the detailed tasks and subtasks associated with the selected Product Backlog items may not be fully defined during the Sprint Planning Meeting.

The idea is to strike a balance between having a clear plan for the selected work and allowing for flexibility and adaptability within the sprint. The Scrum Team may refine and adjust the Sprint Backlog as they gain more insights during the sprint.

🌐 Never Miss a Beat: Noty's Meeting Follow-ups at Your Fingertips!

Ready to lead impactful meetings? Noty's AI meeting follow-ups keep you on track and ensure nothing gets overlooked. Click to elevate your meeting leadership skills and leave a lasting impression!

Learn about AI follow-ups

What is the maximum duration of each sprint planning meeting section?

In the Scrum framework, there isn't a strict maximum duration specified for each section of the Sprint Planning Meeting. However, the overall time-box for the entire Sprint Planning Meeting is recommended to be within certain limits based on the length of the sprint. The guidance is as follows:

For a one-month (four-week) sprint: The overall time-box for the entire Sprint Planning Meeting is suggested to be up to 8 hours.

For shorter sprints (e.g., two weeks or one week): The overall time-box for the entire Sprint Planning Meeting is adjusted accordingly, and it is generally recommended to be proportionally shorter.

While there is no specific maximum duration assigned to each section (What and How) of the Sprint Planning Meeting, the Scrum Team is encouraged to manage the time effectively to achieve the meeting's objectives.

The Scrum Master plays a crucial role in facilitating the meeting, keeping discussions focused, and ensuring that the team stays within the time-box constraints.

It's important to note that these are guidelines, and the Scrum Team may adapt the time-boxes based on their specific context and the need for in-depth discussions.

The primary goal is to have a productive and collaborative meeting that results in a clear Sprint Goal and a committed set of work for the Sprint Backlog.

Final Thoughts

Remember, sprint planning is an iterative process, and continuous improvement is key. Don't hesitate to experiment with different techniques, adapt the process to your specific team dynamics, and embrace the collaborative spirit that lies at the heart of effective scrum practices.

By wielding the power of a well-structured sprint planning meeting agenda, you'll unlock the potential for focused sprints, achievable goals, and ultimately, project success.

So, step into your role as sprint planning maestro, lead your team with clarity and purpose, and watch your agile journey unfold with efficiency and satisfaction. Remember, knowledge is power, and a well-planned sprint is a sprint half-won!

🚀 Close Meetings Strong with Noty's Summary Wizardry!

Seal the deal! Noty's meeting summary feature simplifies post-meeting actions. Click to discover how Noty ensures nothing falls through the cracks, leaving you with successful outcomes.

Elevate your meeting summary game today!

FAQ: Sprint Planning Meeting in Scrum

What is a Sprint Planning Meeting?

The Sprint Planning Meeting is a key event in the Scrum framework, where the Scrum Team collaborates to define the Sprint Goal and select Product Backlog items for the upcoming sprint. It involves discussions between the Product Owner, Scrum Master, and the Development Team to plan and commit to the work that will be completed during the sprint.

Who participates in the Sprint Planning Meeting?

The Sprint Planning Meeting involves the entire Scrum Team, including the Product Owner, Scrum Master, and the Development Team. Their collaboration is essential to ensure a shared understanding of the sprint goal and the work to be accomplished.

What is the purpose of the Sprint Goal?

The Sprint Goal represents the overarching objective that the Scrum Team aims to achieve by the end of the sprint. It provides focus and direction for the team, aligning their efforts with the broader objectives of the product.

How are Product Backlog items selected during the Sprint Planning Meeting?

The Product Owner presents prioritized Product Backlog items, and the Development Team, with input from the Product Owner, selects a set of items they believe can be completed within the sprint. These selected items collectively form the Sprint Backlog.

Is the entire Sprint Backlog defined during the Sprint Planning Meeting?

While the entire Sprint Backlog is not fully defined during the meeting, the Scrum Team defines enough to forecast what can be achieved in the sprint. The focus is on the Sprint Goal, selected Product Backlog items, and a shared understanding of how the work will be done.

What is the role of the Scrum Master in the Sprint Planning Meeting?

The Scrum Master facilitates the Sprint Planning Meeting, ensures that it stays within the time-box, and fosters collaboration among team members. They help remove impediments and create an environment conducive to effective planning.

Can Sprint Planning Meetings vary in duration?

Yes, the duration of Sprint Planning Meetings can vary based on the length of the sprint. For a one-month sprint, it is generally suggested to be up to 8 hours, with adjustments for shorter sprints.

How often does a Sprint Planning Meeting occur?

Sprint Planning Meetings occur at the beginning of each sprint, providing the team with a focused planning session to set the direction for the upcoming work.

What happens if the team cannot complete the selected work during the sprint?

If the team cannot complete the selected work during the sprint, it is discussed in the Sprint Review, and the reasons are explored. This feedback informs future planning and adaptations in subsequent sprints.

Can the Sprint Backlog be adjusted during the sprint?

Yes, the Sprint Backlog can be adjusted during the sprint based on insights gained, changes in priorities, or emerging requirements. The Scrum Team collaborates to adapt to evolving circumstances.